Contemporary protective architecture

Protecting People.Preserving Places.

APS Group assesses risk and delivers specialist systems that strengthen buildings, critical infrastructure and the people who depend on them.

Our technologies

01 —

Blast Resistant Solution

A lightweight barrier against blast effects.

A fast-curing polymer membrane that helps absorb impact energy, contain fragmentation and limit structural damage in new or existing buildings.

APS Group specialist spray-applying a protective polymer membrane

Application sequence

Protection, built layer by layer.

Scroll to follow the spray-applied system.
  1. 01
    Prepare

    The substrate is inspected, cleaned, repaired and primed for full adhesion.

  2. 02
    Spray

    The two-component polymer is applied in controlled passes to build the specified thickness.

  3. 03
    Cure & verify

    Rapid curing is followed by visual, adhesion and thickness quality checks.

Technical performance & applicationsLearn more
6–8 mmTypical coating thickness*
Few daysSpray application
10+ yearsWarranty available*
FireRetardant system
Water & abrasionResistant finish
CostEffective reinforcement

Why this solution

  • Retrofit, not rebuildReinforces existing rooms and structures without heavy safe-room construction.
  • LightweightApproximately 2–10 kg/m² depending on coating thickness.
  • Fast to deployRapid curing helps limit disruption to occupied and operational sites.
  • Additional benefitsNon-toxic once cured, with supplementary sound-reduction performance.

Designed for

  • PeopleBedrooms, protected rooms and safe areas.
  • Public infrastructureHotels, schools, hospitals and essential buildings.
  • HospitalityHotels, resorts and guest environments requiring discreet reinforcement.
  • Critical assetsData centres, refineries and government infrastructure.

*Final thickness, weight and warranty depend on the selected system, substrate, testing requirements and project scope.

Request a quotation

02 —

Waterproofing Solutions

One objective. Two application strategies.

APS Group selects the application method around surface area, access, geometry and return-to-service requirements—creating a fully bonded, seamless barrier without weak joints or overlaps.

APS Group specialists spray-applying a seamless waterproof membrane on a roof in Dubai

Application to protection

A seamless barrier that turns rain away.

Scroll from installation to rainfall.
  1. 01
    Prepare

    The surface and every junction are cleaned, repaired and prepared for full adhesion.

  2. 02
    Apply

    The selected membrane is installed continuously to the project-specific build-up and thickness.

  3. 03
    Protect

    Once cured, the fully bonded membrane leaves no seams or overlaps for rainwater to track through.

Application options & system performanceLearn more

01 · Large surfaces

Spray-applied membrane

For speed, uniform thickness and uninterrupted coverage.

  • Roofs, podium decks and exposed structures
  • Rapid coverage across large or complex areas
  • Options for UV, traffic, impact and chemicals
  • Rapid application to the required thickness

02 · Small and detailed surfaces

Cold-applied membrane

For precise work around details, difficult access and local repairs.

  • Terraces, balconies, wet areas and junctions
  • Applied by roller, brush, rake or trowel
  • No heating or specialist spray equipment required
  • Fully bonded, seamless and crack-bridging
≈30 min*Rapid waterproofing
100% solidsVOC-free · zero solvents
SeamlessFully bonded barrier
01
Complex geometry

Continuous coverage across corners, penetrations and irregular surfaces.

02
Built for exposure

Selected systems resist abrasion, impact, chemicals, UV and traffic.

03
Controlled installation

Substrate preparation and application are matched to real site conditions.

04
Project-specific build-up

The final system is defined around access, surface, use and return-to-service needs.

*Actual curing time and performance depend on the selected system, substrate preparation and site conditions.

Request a site assessment

03 —

Our Markets

Protection across the places people rely on.

From occupied buildings to high-consequence industrial sites, APS Group adapts the protection strategy to the asset, its users and its operational priorities.

Residential towers in Dubai at sunset
01

Residential

Private homes, residential towers, protected rooms and community assets.

School students approaching a campus in Dubai
02

Education

Schools, campuses and facilities supporting daily learning.

Hospital and landscaped grounds in the UAE
03

Healthcare

Hospitals, clinics and essential healthcare environments.

Luxury resort on Palm Jumeirah in Dubai
04

Hospitality

Hotels, resorts and guest environments requiring discreet protection.

Large data centre and cooling infrastructure
05

Data Centres

High-value digital infrastructure requiring continuous protection.

Oil refinery and storage tanks
06

Oil & Gas

Refineries, processing plants and assets exposed to demanding conditions.

Strategic government aviation facility
07

Government

Public buildings and strategic government infrastructure.

Zayed International Airport terminal in Abu Dhabi
08

Secure Facilities

Airports, controlled logistics hubs and other security-sensitive environments.

04 —

Selected References

Proven across demanding environments.

Representative work across landmark developments, essential infrastructure and high-security environments.

Blast mitigation test structure

Blast resistant references

Protection where consequences are high.

  • UAEAmmunition storage rooms

    Polymer reinforcement to help protect surrounding facilities from shockwaves, fragmentation and debris.

  • SomaliaMilitary base

    Reinforcement for critical infrastructure exposed to blast shockwaves and shrapnel.

  • JordanFive-star hotel suites

    VIP room protection designed to improve resistance to fragmentation and shrapnel.

Waterproofed roof under heavy rain with the Dubai skyline

Waterproofing references

Seamless protection at scale.

  • 9,000 m² · UAEMarsa Al Arab

    Spray-applied continuous membrane across a major podium deck.

  • 40,000 m² · UAEJebel Ali Treatment Plant

    Protective lining for primary sedimentation tanks in a demanding operational environment.

  • 6,800 m² · UAEEmirates Airlines Ramool Warehouse

    Cold-applied waterproofing for a metal roof and its detailed junctions.

05 —

Our Process

A clear route from risk to protection.

One accountable sequence, from the first site review to the final quality handover.

  1. 01

    Understand

    Site assessment

    Infrastructure, surface, exposure, access and project constraints.
  2. 02

    Define

    Action plan & quotation

    Technical approach, system build-up, scope and commercial proposal.
  3. 03

    Deliver

    Specialist installation

    Surface preparation and application by trained specialists.
  4. 04

    Confirm

    Quality handover

    Final checks, practical guidance and post-project support.
Dubai cityscape with Burj Khalifa and a McLaren

06 —

Technology & Quality

Local application. International technologies.

APS Group combines local project delivery with a Dubai-based technology partner developing specialist polyurea, polyurethane and polyaspartic systems since 2003.

01

Specialist formulationsSystems developed for buildings, infrastructure and industrial assets.

02

Application expertiseTechnical support for system selection, equipment and installation.

03

Recognised standardsQuality, environmental, health and safety management credentials.

  1. 2004Dedicated manufacturing facility commissioned
  2. 2008Exclusive Graco HPCI distributor in the Middle East
  3. 2019Expanded operations and manufacturing internationally
ISOISO 9001:2015

Quality management system

ISOISO 14001:2015

Environmental management system

ISOISO 45001:2018

Occupational health and safety

WRASWRAS Approved

Drinking-water applications

Industry recognition

  • PDA Europe member
  • Coatings & Waterproofing Supplier of the Year 2023
  • Graco HPCI spray equipment distributor

Certifications, approvals and industry recognition relate to the technology partner and selected systems.

07 —

Discuss a Project

Start with the asset. We’ll define the protection.

Send us the project location, the risk or problem to address, approximate area and current stage. We’ll recommend the right next step.

Emailcontact@apsgroup.aeCall+971 54 439 2443
LocationDubai, United Arab Emirates